Anti-Termite Calculator

Calculate chemical solution for pre-construction anti-termite treatment per IS 6313. Enter plinth area, foundation perimeter, trench dimensions, and chemical concentration.

๐Ÿœ Anti-Termite Calculator

Solution Required

Soil Treatment464.5 liters
Trench Treatment41.4 liters
Total Solution505.9 liters

Chemical Breakdown

Chemical (concentrate)5.06 liters
Water500.9 liters
ByPRIYA SHARMAโ€ขUpdated April 20, 2026
|
Reviewed byDR. RAJIV NAIR
|
Fact checked byNEHA KAPOOR

What Is Anti-Termite Treatment?

Pre-construction anti-termite treatment creates a chemical barrier between the soil and the building foundation to prevent termites from entering the structure. It is applied during construction before flooring, as per IS 6313 (Part II).

Treatment Stages

  1. Soil Treatment โ€” Chemical emulsion applied to the excavated soil and backfill around the foundation at 5 liters/mยฒ of surface.
  2. Foundation Trench โ€” Emulsion poured along the foundation trench perimeter at 7.5 liters/mยณ.
  3. Plinth Filling โ€” Top soil layer treated before PCC/flooring.

Common Chemicals

ChemicalConcentrationLife
Chlorpyriphos1% EC5โ€“10 years
Imidacloprid0.05%10โ€“15 years
Fipronil0.1%10+ years